If your property cannot connect to the mains sewer network, installing the right sewage treatment system is essential for managing wastewater effectively. At Clenviro, our Matrix sewage treatment plant provides a reliable solution for domestic and commercial applications. But what is the installation process?
From assessing the site and selecting the right Matrix system through to installation and commissioning, here is the typical sewage treatment plant installation process and what you can expect at each stage.
1. Assessing your site
Every Matrix installation starts with understanding the requirements of the site.
Factors including the number of people using the system, expected wastewater flow, available space, ground conditions and discharge requirements all need to be considered.
Access is important too. The location needs to allow for installation as well as future servicing and desludging.
Taking these factors into account helps determine the most appropriate Matrix system and installation approach for the application.
2. Choosing the right Matrix system
Not every site has the same wastewater requirements, which is why correct specification is an important part of the process.
The Matrix sewage treatment system can be selected to suit the required capacity and application, providing an effective treatment solution where connection to mains drainage is unavailable or impractical.
By establishing the site's requirements from the outset, the system can be tailored to deliver the required treatment performance while providing a practical long-term wastewater solution.
3. Preparing the ground
Once the Matrix system has been specified and its position agreed, preparation for installation can begin.
The site is excavated to the required dimensions and a suitable base is prepared according to the installation requirements and ground conditions.
Existing drainage and the proposed inlet and outlet connections also need to be considered at this stage.
Good preparation helps ensure the Matrix unit can be positioned correctly and securely before connections are made.
4. Installing the Matrix Treatment Plant
The Matrix unit is carefully lowered into the prepared excavation and positioned at the required level.
The inlet and outlet pipework can then be connected before the system is backfilled in accordance with the installation requirements.
Getting this stage right is important. Correct positioning, levels and connections all contribute to reliable operation once the sewage treatment plant is in use.
5. Connecting the Matrix System
Once installed, the Matrix becomes part of the property's wastewater system.
Wastewater flows from the property into the treatment plant, where it passes through the Matrix treatment process. The system uses biological treatment to treat wastewater before the resulting effluent is discharged through the site's approved discharge arrangement.
This provides an effective alternative for properties and developments where connection to the mains sewer network is not available.
6. Commissioning the System
A professional sewage treatment plant installation doesn't finish when the tank is in the ground.
Before the Matrix system enters normal operation, it needs to be checked and commissioned. Connections, components and the overall installation can be inspected to make sure everything has been installed correctly, and the plant is ready for use.
The system can then begin establishing the biological treatment process required for effective ongoing wastewater treatment.
7. Keeping your Matrix system performing
Once installed, ongoing maintenance is important for keeping any sewage treatment plant operating effectively.
Routine servicing provides an opportunity to inspect the system, identify potential issues and ensure components continue to operate as intended. Periodic desludging will also be required depending on the size and usage of the system.
Considering access and maintenance requirements during the initial installation can make looking after your Matrix system much easier over its working life.
Looking for a Matrix Sewage Treatment Plant?
A successful sewage treatment plant installation starts with choosing a system suited to the property, application and site conditions.
Our Matrix sewage treatment systems are designed and manufactured to provide practical wastewater treatment solutions for sites without access to mains drainage.
From selecting the right Matrix system through to installation and ongoing requirements, our team can help you find a solution designed around your site – contact us today.
Disclaimer: Commissioning is an optional service, particularly for smaller domestic sewage treatment systems. However, commissioning requirements may vary depending on the system, installation conditions and applicable regulations. Please contact our team for guidance.